Implementation Activities

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Implementation awards will be administered by NOACA staff in partnership with participating communities. Implementation awards will fund projects recommended in completed TLCI plans, or in plans that:

  • Included a public involvement/engagement process (must include public meetings with neighborhood or community feedback specific to the transportation component)
  • Have a multimodal transportation focus (i.e., pedestrian, bicycle, roadway, safety, and/or transit analysis and recommendations)
  • Recommend specific countermeasures at specific locations

Implementation awards will result in the programming, procurement, and installation of infrastructure that achieves the goals of the TLCI program. Projects will be balanced across transportation modes, with the goal of comprehensively improving accessibility and safety at specific locations.

All TLCI Implementation projects must be developed in accordance with the ODOT Project Development Process (PDP).  Most TLCI implementation projects follow the milestones defined for ODOT PDP Path 1. Submittals may be combined, removed, or added as deemed appropriate by the ODOT Project Manager.  ODOT, in concurrence with NOACA, has the role of oversight over TLCI Implementation projects. Projects will either be ODOT let or local let requiring ODOT approval.  See ODOT’s Locally Administered Transportation Projects Manual of Procedures webpage for more information.

Projects prioritized for funding though implementation awards include the components listed in the table below, which were identified as the most frequent recommendations from past TLCI projects and from a survey of local partners in 2015. The funding limit per unit for each component type is included as a guideline for funding requests. Projects are encouraged to include multiple components. The funding minimum for projects is $100,000.

Top Needs from TLCI Database Analysis & Survey

Bicycle Recommendations

Bike Lanes
   Striping ($50,000/mile)
   Bike Signals ($20,000/intersection)
   Bike Detection ($2,500/each)
   Bike Parking

   Bike Rack ($200/rack)

   Bike Locker ($2,000/each)

   Bike Corral ($4,000/each)
Shared Routes

   Sharrows ($10,000/mile)
   Signed Route ($3,000/mile)
Wayfinding and Signage ($300/sign)

Pedestrian Recommendations

Crosswalk Enhancements
   Ladder Crosswalk ($5,000/pair)
   Curb Extension ($50,000/each)
   Raised Crosswalk ($50,000/each)
   Crossing Island ($10,000/each)
   Curb Ramps ($12,000/intersection)
   Pedestrian Signals ($20,000/intersection)
RRFB ($20,000 /intersection)
Benches ($1,500/each)
Wayfinding & Signage ($300/sign)

Transit Recommendations

Transit Waiting Environment ($50,000/each)
Wayfinding & Signage ($300/sign)

Roadway Recommendations

Road Diet ($50,000/mile)
On-Street Parking ($50,000/mile)
Reconfigured Intersection ($100,000/intersection)
AccessManagement ($10,000/curb cut)