On September 14, 2007, the NOACA Governing Board approved the following regarding these projects:
Resolution No. 2007-032 Project Planning Review
Resolution No. 2007-033 Plan and TIP Amendment
Title: SR-82 Resurfacing in Eaton and Columbia Townships
Sponsor: ODOT - District 3
PID No.: 80168
Estimated Total Cost: $4,363,515
Proposed Source of Federal Funds: ODOT
History/Background: This project is included in ODOT District 3’s Major Rehabilitation Program.
Current Conditions: SR-82 (Elyria–Twinsburg Road) is functionally classified as an urban minor arterial. SR-82 is a two-lane facility with a pavement width of 30 feet, including paved shoulders three feet wide. The lanes are twelve feet wide, and the width of the existing right-of-way is 60 feet. The average daily traffic (ADT) is 10,130 vehicles per day with about six percent trucks (2005). The legal speed limit is 55 miles per hour.
Proposed Project: This project involves the rehabilitating 10.06 miles of SR-82, from SR-57 (Elyria-Medina Road) to the Cuyahoga County line, in Eaton and Columbia Townships. SR-82 will remain a two-lane facility with lanes twelve feet wide and paved shoulders three feet wide. The cost of construction is estimated to be $4,363,515. Eighty percent ($3,409,812) of the construction (C) cost will be funded with State Surface Transportation Program (S/STP) funds. ODOT will provide the remaining twenty percent (20%) of the construction cost ($872,703). The project is expected to be awarded by May 2008.
Staff Comment (Summary):
Transportation Improvement Program (TIP) Team:
- This project meets NOACA’s Connections 2030 Goal # 3 (Preserve and Improve the Efficiency of the Transportation System) and ODOT’s Access Ohio Goal # 1 (System Preservation and Management).
- Move for committee and public review in order to obtain comments.
Regional Transportation System (RTS) Team:
- This has a 2006 pavement condition rating (PCR) of 67-58 (Fair-Fair-Poor) and is projected to have PCR of 60-52(Fair-Fair-Poor) in 2009.
- This section of SR-82 has two 12-foot lanes and 3-foot paved shoulders. However, due to the high ADT and 55 mph speed limit, federal guidelines call for 6-foot paved shoulders for experienced cyclists. However, this is a resurfacing project only. When major reconstruction work is done, wider paved shoulders are recommended. It is recommended to post “Share the Road” signs along the roadway.
Intergovernmental Review and Consultation (IGRC):
If you are a representative of a governmental entity and would like to comment on this project, please email us.
"The Lorain County Community Development Department and Lorain County Planning Commission support this project." - The Lorain County Community Development Department
Public Involvement:
NOACA encourages comments from the public on this proposed transportation improvement project. Please notify us if you would like to be added to our e-mail notification list for future updates.
Committee Review:
Bicycle Advisory Council (BAC):
-
This section of SR-82 has two 12’ lanes and 3’ paved shoulders. Due to the high ADT and 55 mph speed limit, federal guidelines call for 6’ paved shoulders for experienced cyclists. However, this is a resurfacing project only. If possible, add more width to the paved shoulders. When major reconstruction work is done, provide at least 4’ wide paved shoulders. At this time, it is recommended to pave the existing shoulders and post “Share the Road” signs along the roadway.
Regional Transportation Investment Subcommittee (RTIS)/Transportation Advisory Committee (TAC):
- No comments; recommended for amendment to NOACA's Transportation Plan and TIP.
|
|
|