Title: City of Cleveland Paving Projects
Sponsor: Cleveland
Name: CENTER ST; ELM ST and MAIN AVE
Estimated Total Cost: $4,040,950
Proposed Source of Federal Funds: NOACA

CUY CENTER ST - This project involves rehabilitation along Center Street, from River Road to Old River Road in Cleveland (location map). The sponsor reports that Center Street is a primary route for truck traffic in the industrial area of the Flats. The work includes milling the existing asphalt and replacing it with a three-inch asphalt overlay, performing base repair as needed and installing ADA (Americans with Disabilities) compliant curb ramps. The estimated total cost of the project is $1,927,050. The estimated cost of preliminary engineering preliminary development (PEPD) is $100,000. The estimated cost of preliminary engineering detailed design (PEDD) is $50,000. The estimated construction cost is $1,777,050. The sponsor requests that eighty percent ($1,421,640) of the construction cost be funded with STP funds. The sponsor will provide the non-federal share of construction ($355,410). The sponsor reports that the project can be designed and ready to construct by September 2018.

CUY ELM ST - This project involves rehabilitation along Elm Street, from Division Avenue to Main Avenue, in Cleveland (location map). The sponsor reports that Elm Street is a primary route for truck traffic in the industrial area of the Flats. The work includes milling the existing asphalt and replacing it with a three-inch asphalt overlay, performing base repair as needed and installing ADA (Americans with Disabilities) compliant curb ramps. The estimated total cost of the project is $1,053,100. The estimated cost of preliminary engineering preliminary development (PEPD) is $100,000. The estimated cost of preliminary engineering detailed design (PEDD) is $50,000. The estimated construction cost is $903,100. The sponsor requests that eighty percent ($722,480) of the construction cost be funded with STP funds. The sponsor will provide the non-federal share of construction ($180,620). The sponsor reports that the project can be designed and ready to construct by September 2018.

CUY MAIN AVE - This project involves rehabilitation along Main Avenue, from West 25th Street to Center Street in Cleveland (location map). The sponsor reports that Main Avenue is a primary route for truck traffic in the industrial area of the Flats. The work includes milling the existing asphalt and replacing it with a three-inch asphalt overlay, performing base repair as needed and installation of ADA (Americans with Disabilities) compliant curb ramps. The estimated total cost of the project is $1,060,800. The estimated cost of preliminary engineering preliminary development (PEPD) is $100,000. The estimated cost of preliminary engineering detailed design (PEDD) is $50,000. The estimated construction cost is $910,800. The sponsor requests that eighty percent ($728,640) of the construction cost be funded with STP funds. The sponsor will provide the non-federal share of construction ($182,160). The sponsor reports that the project can be designed and ready to construct by September 2018.

Staff Comment (Summary):

General comments:

• These projects are consistent with NOACA’s Connections+ 2035 Goal #3 (Preserve and Improve the Efficiency of the Transportation System).
• NOACA’s STP funds are programmed through SFY 2017. If these proposed projects are approved, they will be amended to NOACA’s long-range transportation plan.
• Recommend committee and public review in order to obtain comments.

Committee Review:

Transportation Subcommittee:
• No comments; recommended for Planning and Programming Committee review.

Planning and Programming Committee:
• No comments; recommended for Executive Committee review. 

Executive Committee:
No comments; recommended for Board of Directors review.

Intergovernmental Review and Consultation (IGRC):

Public Involvement: