Title: Bridge and Culvert Projects
Sponsor: ODOT District 12
Estimated Total Cost: $18,393,000
Proposed Source of Federal Funds: ODOT District Preservation Program

History/Background: These projects are included in the ODOT District 12 Programs.

CUY US-6 - 21.27: PID No. 94577 - This project involves the rehabilitation, replacement or otherwise upgrade of the 15 foot stone arch drainage structure carrying Dugaway Brook under Euclid Avenue (US-6), located just east of Superior Avenue, in East Cleveland (location map). The estimated cost of construction (C) is $500,000. Eighty percent ($400,000) of the construction cost will be funded with District Preservation (Pavement and Bridge) funds. ODOT will provide the ten percent ($100,000) matching funds. The project will be ready to construct by January 2019.

CUY SR-14 - 02.19 PAINT: PID No. 90202 - This project involves painting the bridge on Broadway Avenue (SR-14), over IR-490, in Cleveland (location map). The estimated cost of construction (C) is $3,140,000. Ninety percent ($2,826,500) of the construction cost will be funded with District Preservation (Pavement and Bridge) funds. ODOT will provide the ten percent ($314,000) matching funds. The project will be ready to construct by January 2019.

CUY IR-71 - 17.95L: PID No. 81552 - This project involves replacing the deck of the SR-176 southbound bridge, over IR-71 southbound, in Cleveland (location map). The project’s estimated total cost is $1,755,000. The estimated cost of preliminary engineering detailed design (PEDD) is $150,000. The PEDD will be funded by ODOT. The estimated cost of construction (C) is $1,605,000. Ninety percent ($1,444,500) of the construction (C) cost will be funded with District Preservation (Pavement and Bridge) funds. ODOT will provide the ten percent ($160,500) matching funds. The project will be ready to construct by October 2018.

CUY IR-90 - 24.63: PID No. 88348 - This project involves replacing the decks of the mainline IR-90 bridges, over East 140th Street and East 152nd Street, in Cleveland (location map). The project’s estimated total cost is $12,998,000. The estimated cost of preliminary engineering detailed design (PEDD) is $800,000. The PEDD will be funded by ODOT. The estimated cost of construction (C) is $12,198,000. Ninety percent ($10,978,200) of the construction (C) cost will be funded with District Preservation (Pavement and Bridge) funds. ODOT will provide the ten percent ($1,219,800) matching funds. The project will be ready to construct by January 2019.

Staff Comment (Summary):

Programming Division:

• These projects are consistent with NOACA’s Connections+ 2035 Goal #3 (Preserve and Improve the Efficiency of the Transportation System).
• Recommend committee and public review in order to obtain comments.

Committee Review:

Transportation Subcommittee:
• No comments; recommended for Planning and Programming Committee review.

Planning and Programming Committee:
• No comments; recommended for Executive Committee review.

Executive Committee:
• No comments; recommended for Board of Directors' review.

Intergovernmental Review and Consultation (IGRC):

Public Involvement: