On December 11, 2009 the NOACA Governing Board approved the following regarding this project:
Resolution No. 2009-037 Project Planning Review
Resolution No. 2009-038 Plan and TIP Amendment
Title: Resurface SR-306 in Russell and Chester Townships
Sponsor: Ohio Department of Transportation-District 12 (ODOT)
PID No.: 84280
Estimated Total Cost: $1,320,000
Proposed Source of Federal Funds: ODOT
History/Background: This project is included in ODOT District 12’s 2011 District Pavement Program.
Current Conditions: SR-306 (Chillicothe Road) is functionally classified as an urban principal arterial. SR-306 is a two-lane facility. The pavement width is 30 feet with lanes twelve feet wide and paved shoulders three feet wide. The width of the existing right-of-way varies from 60 to 130 feet. The average daily traffic is 11,390 vehicles per day with 3.43 percent trucks (2007). The legal speed limit is 35 miles per hour.
Proposed Project: The project involves resurfacing 4.12 miles of SR-306, from SR-87 (Kinsman Road) to US-322 (Mayfield Road), in Russell and Chester Townships (location map). The construction cost is estimated to be $1,320,000. Eighty percent ($1,056,000) of the construction cost will be funded with State Surface Transportation Program (S/STP) funds. Twenty percent ($264,000) of the construction cost will be funded by ODOT. This project has an estimated award date of May 2010.
Staff Comment (Summary):
Plan and Transportation Improvement Program (TIP) Team:
- This project is consistent with NOACA’s Connections 2030 Goal #3 (Preserve and Improve the Efficiency of the Transportation System) and ODOT’s Access Ohio 2004 - 2030 Goal #4 (System Preservation).
- Recommend committee and public review in order to obtain comments.
Regional Transportation System (RTS) Team:
- In 2008, the Pavement Condition Rating (PCR) for this stretch of SR-306 was 64 which is in the fair to poor range. At the anticipated time for construction (July 2010), the RPMS predicts a deteriorated PCR of 57 for this section of roadway. The RPMS system recommends that reactive maintenance (resurfacing) occur on this segment of SR-306.
Intergovernmental Review and Consultation (IGRC):
If you are a representative of a governmental entity and would like to comment on this project, please email us.
Public Involvement:
NOACA encourages comments from the public on this proposed transportation improvement project. Please notify us if you would like to be added to our e-mail notification list for future updates.
Committee Review:
Regional Transportation Investment Subcommittee (RTIS)/Transportation Advisory Committee (TAC):
-
No comments; recommended for amendment to NOACA's Transportation Plan and Transportation Improvement Program (TIP).
Bicycle Advisory Council (BAC):
-
Reduce lane widths to 11 feet and provide a 4-foot paved shoulder. Post “Share the Road” signs at appropriate intervals.
Asset Management Council:
- This project is consistent with Asset Management Council goals.
|
|
|